ID: 24660

01.12.21

Business

Currently operating 1.4 MW solar power plant with an expansion project to 9.4 MW

A 9.4 MW solar power plant project is offeres for purchase, of which 1.4 MW has already been put into operation in Ternopil region

Location:

Тернопольская область, Украина

  • Sector: Energy
  • Business activity: Renewable energy
  • Price: $2 000 000
  • Share: 100%

General project information

Land plot area: 17.9409 hectares (private ownership).

Location: Ternopil region, Ivankov village (outside the village)

Legal land purpose: 14.01. For placement, construction, operation and maintenance of buildings and structures of facilities of power generating enterprises, institutions and organizations.

Cadastral number of the site: 6120883000:01:001:0935.

The total capacity of the power plant: 9.4 MW (1.4 + 3.5 + 4.5). The project is being implemented in stages.

1) The first stage with a capacity of 1.4 MW.

2) The second stage with a capacity of 3.5 MW

3) The third stage with a capacity of 4.5 MW.

Current condition: construction is completed and the first stage with a capacity of 1.4 MW has been put into operation. In November 16, 2021, the appropriate authorities checked the plant and the test month of generation began.

Rate: € 0.11.

Voltage class: 35kV.

Solar panels: JA Solar Holdings Co., Ltd.

Inverters: SUNGROW

Stage of project implementation

The following types of work were carried out on the project of the Ivankov-1 photovoltaic station:

  • The legal purpose of the land has been changed (14.01);
  • Contracts for connection to the power grid were concluded and technical specifications were received (2 contracts for technical specifications for 4.5 MW);
  • The entire section of the power plant was fenced;
  • Topographic survey and geological studies of the land plot were carried out;
  • Urban planning conditions and building restrictions were obtained;
  • Contracts have been concluded for the design of a solar power plant;
  • A contract for the design of the linear part of the connection and a general contract have been concluded;
  • The first stage of the 1.4 MW plant was built with a license to generate electricity.
  • Work is underway to build an external connection line.
  • An agreement for the purchase of electricity was signed with the State Enterprise "Guaranteed Buyer".
  • The declaration of commissioning has been registered.

List of ready-made documents and permits for the power plant:

1.Business plan rationale has been prepared.

2.Land plot:

  • Analysis of the cost of connection;
  • Ownership of the land plot;
  • Town planning conditions and restrictions;
  • Geodesy of the land plot;

3.Technical specifications:

  • Feasibility study of the connection;
  • Connection agreement and technical conditions;
  • Voltage class - 35kV

4.Solar power plant project:

  • Project for the construction of a solar power plant;
  • Comprehensive examination of the project - CC1;

5.Connection project:

  • Project for connecting to external networks;
  • Technical solutions OSR (Oblenergo);
  • Coordination of the draft OSB (NEC "Ukrenergo");
  • Coordination in the Energorynka.

6.Permits for construction:

  • General contractor agreement;
  • Construction permit.

Offer for investor

The trent of the development of solar energy in Ukraine

Ukrainian renewable energy is represented by 8.5 GW of generating capacity, investments of local and foreign companies in the sector amount to 11 billion euros.

Payments for generation at the “green tariff” from the State Company “Guaranteed Buyer”: as of 11.26.21 for 2020 (January - December), 100% of the debt to electricity producers was repaid at the “green tariff”.

It is offered for the investor a few options:

 

Option 1

  • purchase of a 9.4 MW project;
  • operating 1.4 MW SPP (Solar Power Plant) at the “green tariff”;

1.4 MW at the time of purchase will be fully operational and completed by the current owner.

The second and third stages with a capacity of 3.5 MW and 4.5 MW, respectively, will be implemented by the new owner.

Subject of sale - corporate rights of LLC (founders - individuals) with an operating 1.4 MW SPP and all permits and a project for 3.5 + 4.5 MW SPP.

Actual costs:

Equipment, construction of 1.4 MW + permits for 9.4 MW: $1 288 000

External line: $487 000

VAT on the balance sheet: $300 000

Additional investments for implementation (3.5 + 4.5 MW): $4 175 000

Payback period: 8 years

Cost of Option 1: $2 000 000 for 100%.

 

Option 2

  • purchase of a 9.4 MW project;
  • operating 1.4 MW SPP (Solar Power Plant) at the “green tariff”;
  • construction (2nd and 3rd stages) and generation at an unregulated tariff.

 

1.4 MW at the time of purchase will be fully operational and completed by the current owner.

The second and third phases with a capacity of 3.4 MW and 4.5 MW, respectively, will be sold by the new owner for sale at an unregulated tariff for local enterprises (quarry, juice plant, granaries, asphalt plant).

Additional investments for implementation (3.5 + 4.5 MW): $4 175 000

Payback period: 7 years

Cost of Option 2: $2 000 000 for 100%.

 

Option 3

  • purchase of a 9.4 MW project;
  • operating 1.4 MW SPP (Solar Power Plant) at the “green tariff”;
  • construction (2nd and 3rd stages) and generation at an unregulated tariff;
  • construction of the Energy Storage.

1.4 MW at the time of purchase will be fully operational and completed by the current owner.

The second and third stages with a capacity of 3.5 MW and 4.5 MW, respectively, will be sold by the new owner for sale at an unregulated tariff for local enterprises (quarry, juice plant, granaries, asphalt plant). Electricity accumulation by the Energy Storage and sale at peak loads plus generation balancing.

Additional investments for implementation (3.5 + 4.5 MW): $4 175 000

Additional Investment for Energy Storage: $ 800 000

Payback period: 6 years

Cost of Option 3: $2 000 000 for 100%.

 

Option 4

  • splitting the 9.4 MW project into (1.4 MW - operating station at the “green tariff” and 8 * 0.99 MW).

1.4 MW at the time of purchase will be fully operational and completed by the current owner.

At the request of the investor, new technical specifications will be received and 8 MW (0.99 MW * 8) will be split with the establishment of 9 separate legal entities.

Subject of sale - corporate rights of 9 legal entities in the form of LLC (founders - individuals).

Actual costs:

Equipment, construction of 1.4 MW + permits for 9.4 MW: $1 288 000

External line: $487 000

VAT on the balance sheet: $300 000

Additional investments for the implementation of splitting of 0.99 MW and further construction of 8 MW:

$576 000 ($72 000 per 1 MW) for obtaining new technical specifications

$4 175 000 for construction

Payback period: 6 years

Cost of Option 4: $2 000 000 for 100% and additional investment for splitting and re-obtaining of technical specifications.

 

Location

Contacts

Алексей Олейников

info@inventure.ua +380677136571

Connect with us!