Location: Poltava region, Myrhorod (previously the territory of the sugar mill)
Area: 5.55 ha (rent)
Designated purpose: 11.02 “Industrial lands for the placement and operation of main and auxiliary buildings and facilities of the processing, engineering and other industrial enterprises”.
Total area of buildings and structures: 747.1 sq.m. (administration and amenity building, laboratory, weighthouse, warehouse, garage)
Utilities:
1) Electricity: 160 kW (transformer substation is located on the territory)
2) Water supply: central system
3) Railway station: 200 meters from the property
4) Railway branch: 400 meters (on the territory of the site), dead end siding
Additional information is available upon request.