The goal of the project: creation of a network of complexes for the disposal of hazardous, medical and other waste according to European standards on the territory of Ukraine to prevent the catastrophic consequences of war in the field of ecology.
About the company: Bresson Reenergy - the first company in the field of disposal of hazardous waste was founded in 2015. The first set of equipment was placed in the city of Brovary, Kyiv region. As of early 2022, our alliance owns three companies with equipment and licenses for the collection, processing and high-temperature disposal of medical and other hazardous waste. The company is included in the TOP-5 companies - leaders of waste management in Ukraine.
Consequences of the impact of military operations on the environment
- lands contaminated with petroleum products in the places of exploded oil depots
- contamination with fuel and oils in the places of destroyed fuel tankers and warehouses
- bombed warehouses with pesticides, herbicides and other poisons
- significant increase in medical waste
The general situation on the waste market of Ukraine
By the beginning of 2022, there were about 20 companies in Ukraine that had the necessary equipment for the disposal of hazardous waste. As of April, half of the complexes have been destroyed or are inaccessible due to hostilities.
Compared to the pre-war period, only medical waste has increased tenfold, and disposal companies are unable to cope with their processing and incineration.
Concept of the project
1. Creation of a company for the collection, storage, transportation and disposal of hazardous waste in the Western region of Ukraine.
2. Installation of specialized high-tech equipment and creation of a high-quality material and technical base of the enterprise.
3. Obtaining a license and necessary permits for this type of activity.
4. Start of work on processing and disposal of hazardous waste that was formed and accumulated as a result of military operations.
5. Expanding the capacities of the complex due to the import and disposal of waste from Europe.
Recycling technology includes:
- Delivery of waste by special transport
- Waste sorting and incineration
- Processing and cleaning of flue gases
- Disposal of safe ash at a landfill
Financials
Preparation of documentation, agreement, obtaining a license - 60,000 EUR
Construction works - 330,000 EUR
The equipment of the utilization complex - 1,600,000 EUR
Vehicles, equipment - 85,000 EUR
Additional equipment and inventory - 70,000 EUR
Working capital, marketing - 100,000 EUR
Total (required investment): EUR 2,245,000
Project creation period: 8 months
IRR: 30.1%
Additional information is available upon request.