Location: Poltava Region
Land plot: 13.8 ha (leasehold)
Logistics accessibility: 3 railway sidings, 2 truck scales with a capacity of 80 tonnes each. There are no other oil extraction plants within a 180 km radius.
Storage Infrastructure:
- Floor-storage grain elevator — 30,000 tonnes
- Metal silo — 11,500 tonnes
- Vertical oil storage tank — 1,000 tonnes
- 4 receiving pits
- BSH 200 grain dryer
- Internal and external tanks are available for oil storage. Internal tanks provide 58 tonnes of one-time storage capacity, while external tanks provide 454 tonnes of one-time product storage capacity.
Oil Pressing Facility:
- Processing capacity: 280 tonnes/day of sunflower seeds (with residual oil content in the oilcake of 20%), or up to 120 tonnes/day with residual oil content in the oilcake of 10%.
- 6 presses
- 3 roasting units
- Modern load-cell weighing equipment
- All equipment manufactured by TAN
- The plant is equipped with an additional grain cleaning and aspiration area, an oil filtration and cooling area, and a steam boiler facility
- Modern Italian boiler house adapted for both oil pressing and extraction — two industrial boilers using sunflower husks as fuel, water treatment equipment, a condensate facility, a generator facility with the required equipment, as well as a station for producing fuel briquettes from sunflower husks.
Potential for Development of an Extraction Facility:
A dedicated area has been allocated on the site for the development of an oil extraction facility. The estimated investment required to establish and equip an extraction complex with a capacity of 280 tonnes/day is approximately $2–2.5 million, depending on the selected equipment configuration, production capacity, and level of process automation.
There is an opportunity to acquire a new extraction line, which is already located in Ukraine (in containers).
Utilities:
- A transformer substation with a capacity of 1,600 kW is located on the site
- Water — 150 m artesian well (owned by the local community)
- Gas — gas distribution station, consumption rate of 250 m³/hour
Offer to Investors:
Price: $1,900,000 (price reduced by 40% in August 2026, urgent sale)