- Location: Zhytomyr region, Litky village
- Area: 8 ha (in property)
- DC power capacity: 4.075 MWp
- Contracted MW AC as per PPA: 3.92
- Average irradiation GHI: 1137 kWh/kWp/m2/year (SolarGIS)
- Quantity of PV modules: 12348
- Modules type and capacity: Seraphim SRP-6PA-330W
- Quantity of inverters: 62
- Type of inverters: Hopewind Hopesun-60KTL
- Quantity of transformer substations: 3
- Type of connection to the substation: 10 kV
- Transformers type: TMG-2000, 2000 kVa, TMG-1600, 1600 Va
- PV Field Orientation: tilt 30 °, azimuth 0 °
- Green tariff: 0,1275 EUR per KWt without VAT
- Price per 1 MWp (DC): 790 000 EUR
- Selling price: 3 219 250 EUR
According to Law No. 3658 of 21.07.2020, the “green” tariff for solar power plants commissioned in 2020 is 127.50 euros per MWh. This tariff will be valid until January 1, 2030.
Due to the low operating costs and the absence of land rent (since the land is privately owned), taking into account the actual generation indicators shown in the table, the payback period is 6,4 years. Ukraine has a great potential for the development of the solar energy segment.
Actual generation in 2020
Month |
Generation, kW |
Em |
Hm |
SDm |
January |
37 500 |
93 300 |
27 |
15 500 |
February |
126 000 |
164 000 |
46.4 |
41 000 |
March |
341 000 |
355 000 |
101 |
70 200 |
April |
413 000 |
474 000 |
143 |
68 800 |
May |
460 000 |
564 000 |
176 |
45 000 |
June |
609 000 |
588 000 |
186 |
33 000 |
July |
615 000 |
578 000 |
184 |
28 900 |
August |
607 000 |
535 000 |
169 |
34 600 |
September |
520 000 |
398 000 |
121 |
71 400 |
October |
202 000 |
270 000 |
79.3 |
57 900 |
November |
90 000 |
102 000 |
30.8 |
16 400 |
December |
37 000 |
63 200 |
19.2 |
175 000 |
Total |
4 057 500 |
4 184 500 |