It is time to invest solar power plants in Ukraine...
Irradiation : 1,200 kWh / kWp
Incentive: 15 Euro cent / kWh
Investment : 700,000 Euro
Yearly Income: 180,000 Euro
Duration: 11 years – then right to sell in free market
The incentive is valid for power plants built until the end of 2019. Since the time is limited, investors should move fast in order not to miss the opportunity:
- With the highest state purchase guarantee (0.15 €/kWh + %20 KDV) and tax incentives in Europe
- Valid until 31.12.2029 for power plants to be established between 2017-2019.
The Company is one of the leading renewable players in Ukraine
After having more than 100 MW experience in Turkey, company is rapidly growing in Ukraine;
20 MWp Under Construction;
55 MWp Shovel Ready Projects;
175 MWp Ongoing Projects.
Shovel ready Projects
Project |
CAPACITY |
ANNUAL INCOME PER MW |
LAND |
LAND STATUS |
GRID CONNECTION COST PER MW |
FINAL PRICE |
Aria |
49 MW |
165,000 € |
79.6 ha |
Lease = 800 €/MW |
40,000 € |
Price on request |
Korosten |
75 MW |
164,470 € |
125 ha |
Lease = 800 €/MW |
40,000 € |
Price on request |
Luginy |
12 MW |
166,350 € |
24 ha |
Lease = 900 €/MW |
35,000 € |
Price on request |
Ignatpil |
14 MW |
163,800 € |
26.5 ha |
Lease = 900 €/MW |
40,000 € |
Price on request |
Malyn |
14.5 MW |
159,450 € |
24 ha |
Lease = 900 €/MW |
40,000 € |
Price on request |
Additional options:
There is a possibility to sign a loan agreement with a local bank located in Ukraine under the following conditions:
- commissioning of solar power plant
- award of feed-in-tariff (green-tariff)
- pledge of shares of project company
- assignment of receivables from electricity produced
- commercial enterprise (movables) pledge