The enterprises specialize in the production and sale of ceramic block 2NF (conversion factor 2.12 to standard brick, grade 100–150, frost resistance F50), facing bricks, and clinker bricks. Product compliance is confirmed by a Certificate of Conformity.
The 2NF block is a ceramic construction block of standard size (250 × 120 × 138 mm), twice the size of a single brick, made from clay by firing. It is used for building load-bearing walls, reducing masonry time and mortar consumption. The block has high strength, good thermal and sound insulation properties, as well as fire resistance, making it a popular material for residential and public construction.
The 2NF ceramic block is suitable for multi-storey buildings, private and suburban houses, cottages, and summer residences. Its performance characteristics also allow for use in industrial and commercial facilities.
Website: fp-klinker.com
Plant No. 1
Location: Zhytomyr region, Zhytomyr district
Established: 2007
Production capacity: 32 million conventional bricks per year (2NF block, coefficient 2.12).
Current status: Manufacturing operations are active.
Key assets:
- Land plot – 13.6412 ha (3 cadastral numbers), land lease agreement since 2017.
- Equipment and property: 1) Brick plant production workshop; 2) Tunnel kiln; 3) In-plant water supply; 4) In-plant cable networks; 5) Gasification of the brick plant; 6) Gas networks; 7) Medium-pressure gas pipeline 0.3 MPa; 8) Gas distribution point (GRP); 9) 3 Power transmission lines of 1000 kVA, 0.8 MW; 10) Transformer substation ZTP 31; 11) Cutting machine Krok-45; 12) Unloader SMK-502; 13) Loader for kiln wagons; 14) Stacking machine SMK-502; 15) Automated control system (ACS) for tunnel kiln and chamber dryers, etc. е
- Railway spur,
- Water supply,
- Sewerage. - Infrastructure prepared for a second workshop, with raw material preparation and stockpiling designed for 2 lines (65 million bricks per year).
- Special permit for subsoil use of plastic clays.
Special permit for subsoil use of loams. - Total deposit area: 16 ha.
Personnel
The workforce consists of 146 employees on shift schedules.
Main professions: shift master, crane operator, raw material preparer, mortar and mix preparer, ceramic products press operator, loading/unloading equipment operator, dryer operator, automatic/semi-automatic line operator (automatic stacker), ceramic/porcelain handler, slinger, packer, kiln operator.
Plant No. 2
Location: Chernihiv region, Nizhyn district
Established: 2002
Production capacity: 23 million conventional bricks per year (2NF block, coefficient 2.12).
Current status: Manufacturing operations suspended since February 2025, with plans to resume in the short term.
Key assets:
- Land plot – 8.9451 ha, land lease agreement dated 2006, term 49 years.
- Land plot – 1.9999 ha, land lease agreement dated 2015, term 49 years.
- Land plot – 39.3978 ha, land lease agreement dated 2015, term 49 years.
- Complex of non-residential buildings with a total area of 12,546 sq.m.
- Own equipment and assets: 1) Brick plant production workshop; 2) Tunnel kiln; 3) In-plant water supply; 4) In-plant cable networks; 5) Gasification of the brick plant; 6) Gas networks; 7) Medium-pressure gas pipeline 0.3 MPa; 8) Gas distribution point (GRP); 9) 2 power transmission lines – main 1000 kVA, 0.8 MW and backup 1000 kVA, 0.8 MW; 10) Transformer substation ZTP 31; 11) Cutting machine Krok-45; 12) Unloader SMK-502; 13) Loader for kiln wagons; 14) Stacking machine SMK-502; 15) Automated control system (ACS) for tunnel kiln and chamber dryers, etc.
- Water supply,
- Sewerage. - Special permit for subsoil use.
Personnel: The workforce consists of 112 employees.
Development Prospects
Reconstruction efforts in Ukraine, participation in national projects, and the facilities’ capacity allow for expansion into a variety of construction materials production.
Investor Proposal
- Subject of sale: 100% equity in two LLCs
- Asking price: $16,000,000 (cost-based valuation approach)
Additional information available upon request.