ID: 27808

10.12.23

Commercial property and real estate in Ukraine

Property complex (2.7 hectares and 8,200 sq.m. of administrative and industrial buildings) in Kyiv fo sale

Property complex with administrative and industrial buildings (2.7 hectares and 8,200 sq.m.) at the address: Kiev, Goloseevsky district, st. Pirogovsky way, 28 for sale

Location:

г.Киев, Голосеевский район, ул. Пироговский путь, 28

  • Type of property: Industrial property
  • Total area: 8200 sq.m.
  • Price: $3 000 000
  • Total land area: 2.73 ha

Brief information about the object

Name of the complex and its location: Property complex with administrative and industrial buildings at the address Kiev, Goloseevsky district, st. Pirogovsky way, 28

Number of buildings: 6

Total land area: 2.7349 ha

Land category: residential and public development land

Purpose of land: 02.07 For other residential development

Total area of the property complex: 8199.80 sq.m., of which:

  • Main production building - 5023.7 sq.m.
  • Administrative and household complex - 1105 sq.m.
  • Cover - 1080 sq.m.
  • Treatment facilities, warehouse - 731.8 sq.m.
  • Boiler room - 188 sq.m.
  • Warehouse of cylinders - 71.3 sq.m.

Location

The land plot on which the property complex is located is located on the right-bank part of the city of Kyiv, in the Goloseevsky administrative district. The site is located in an industrial area, near the Bald Mountain Historical Area and near the Capital Highway.

The entrance to the land plot is provided from Prospect Nauki along Lysogorskaya street, which passes into Pirogovsky put street. The road to the complex has an asphalt surface and two lanes. The land plot has a regular rectangular shape. From the south-east direction, the site borders on the roadway of Pirogovsky put street.

General plan, Landscaping

On the land plot, within the allotted territory, an administrative building and industrial and production buildings are designed outside the territory from the side of the roadway, improvement of the adjacent territory is provided. Entry and exit from the territory of the property complex is carried out through a checkpoint with a security guard and weight control. The territory involves the movement of large-sized equipment, vehicles of service personnel, employees and guests of the complex. The main entrance is located on the side of Pirogovsky Put Street.

Constructive decisions

The structures located on the territory are made of a prefabricated reinforced concrete frame, the internal horizontal enclosing structure is made using reinforced concrete beams and floor slabs. The walls of the structures are made of wall reinforced concrete slabs. Partitions for most rooms are made of solid bricks on a cement-sand mortar with reinforcement with a masonry mesh and fastened to reinforced concrete slabs of the ceiling with a channel.

Engineering Solutions

For these structures, all the necessary external engineering networks have been designed and installed: power supply, water supply and drainage (sewerage), ventilation and air conditioning, heating, lightning protection, outdoor lighting, structured cabling systems (SCS), security alarm system, television and communications. You can familiarize yourself with the engineering networks of the building in detail by reviewing the relevant project documentation.

Contacts

Алексей Олейников

[email protected] +380677136571

Connect with us!